Construction of administrative/commercial facilities is a service of erection, capital and current repair of administrative tasks, commercial facilities, offices, health care and public facilities. The experience gained in this field allows us to establish business relations with all project participants: marketers, consultants (brokerage), designers, process engineers, project managers, technical consultants, etc. This allows us to study the Client's "pains", prioritize tasks, plan stages and types of work.
Construction of residential projects
Construction of residential complexes is a service that allows to realize Clients' ideas into reality. Immersion in the project starts with understanding the concept, capabilities/technical solutions/"handwriting" of the Designer. This is followed by the planning of the construction works, regular monitoring of the completed works and progress reporting.
We are responsible for the timing, quality and budget of the project. We try to negotiate all complicated aspects with the Client as much as possible. Our experience in project realization helps the Client to eliminate deficiencies in units/design in advance, apply alternative solutions, build from scratch. To maintain our reputation, we offer prices for construction work. We leave the procurement and supply of capital intensive materials and equipment to the Client.
We have experience in correcting the shortcomings of previous contractors, adopting abandoned/mothballed works. We have experience in construction on subsidence soils, zones of high seismicity.
At the Kashagan Field Integrated Gas Treatment Facility in WKO the requirements for the works come from international companies such as ______. Compliance with screening, access and compliance requirements at the site itself are critical to the execution of the works. Strict adherence to environmental, health and safety regulations, shift organization, work order/sequence organization, requests and access to working documentation and regular reporting to superiors.
In the construction of engineering structures, preparation of PWP (Project of Works), organization of required material and human resources and their proper allocation for effective implementation of the entire project. Keeping minutes, tracking schedules, recording deviations, catch-up activities, documenting and archiving.
Transportation construction
Communications and reinforced surfaces, bridges, embankments, platforms, overpasses We performed works on erection of a bridge over an artificial reservoir on the project "Green Quarter". We also have extensive experience in the construction of overpasses in Zhambyl region. In total, we have erected more than 10 structures for industrial purposes.
Production and installation of reinforced concrete products
Manufacturing of reinforced concrete products in road construction, municipal construction and landscaping. Our products: stanchions, boards, tray varieties, curbs, stops, beams, reinforcement blocks, stop blocks, slabs and other products.
Our workshop offers a full cycle of products manufacturing: production of formwork, reinforcement, manufacturing and drying of products, mobile laboratory and warehouses for storage of finished products. Our advantage is in the organization of work by a small, close-knit team. We avoid high overhead costs per unit of production. This gives flexibility in pricing the product.
Project Management
Since 2022 we have been actively engaged in project management of Developers in different regions of Kazakhstan. Most of the Developers have experience in construction of buildings, but often do not think like an entrepreneur. Any construction project is tested by time, which means that project solutions should: be relevant to the region, be available for sale, take into account available financing instruments in the market, be detailed in terms of budget and timing, have a clear understanding of who will buy and who will live/use it.
About our company
The company was founded in 2006. We create complex solutions in development, striving for synergy between business and higher values
We have established ourselves as a reliable partner among suppliers, we have experience of working on credit.
We prepare commercial proposals with detailed unit prices.
>30
projects
5800 м3
Reinforced concrete
31000 м2
built
30
employees
Indicators in figures
Atyrau Bridge in Astana
In 5 months instead of 9 months and 960 mln. tg with budget of 1 640 mln. tg.
In Astana tested the strength of a new pedestrian bridge "Atyrau kөnіrі" across the river Esil, reports Tengrinews.kz. On the bridge conducted static and dynamic tests. On its canvas ran 12 ten-ton trucks. This event, as noted in BI Group, was the final stage of quality control of construction and installation work before its evaluation by the final acceptance committee.
The bridge is to connect pedestrian flows and the bicycle network of the park area and the embankment line of the right bank of the Yesil River. The outer shell consists of aluminum cassette panels of triangular shape, creating protection from precipitation and safety. In the central part of the circular ramp implies the location of a public space, made in the form of a tent canopy of diamond-shaped figures. The design of "Atyrau koniiri" is a reference to global trends in architecture, looks modern and fresh and creates a whimsical play of light and shadow inside the pedestrian zone.
"If you look at the bridge from above, the shell resembles the shape of a fish, it is a symbol of the Atyrau region. There is no such bridge in Kazakhstan, this is a very generous gift," Serik Tulebayev, director of the infrastructure directorate of BI Group, told reporters. According to him, high mobilization, competent work with contractors allowed to erect the bridge in 4.5 months. "The technology was followed, weather conditions were taken into account, the metal is of high quality," he said
RC “Koktobe city”
Construction of residential facility Koktobecity Residential Complex 1st, 2nd stages. General contracting works were carried out in accordance with the technical norms of the Republic of Kazakhstan.
Construction of the 2nd stage of Koktobecity took 18 months instead of 24 months. During the period of work the company has proved itself as a responsible partner, able to assume obligations.
Residential Complex "Green Quarter"
Construction of a bridge over a water body, a monolithic retaining wall, a ramp for lowering watercraft. Installation of masonry, flooring and ventilated facade.
Savings to the Client: 210 mln. tg with a budget of 460 mln. tg.
Preparation of closing documents
We have successfully prepared closing documents for a residential complex in Aktau for the amount of 1.9 bln. tg. Closing documents allowed to optimize taxes to the amount of 400 million tg
Availability of a full set of closing documents protects the interests of the buyer, confirms the quality of the object and the legitimacy of the transaction. This is extremely important for a safe and legally competent real estate transaction
Own production plant of reinforced concrete products
In the period 2019-2021 was own mobile plant for the production of reinforced concrete products (reinforced concrete products), installation of reinforced concrete products in the regions (Akmola region, Pavlodar region, East Kazakhstan region, Almaty region
Integrated gas treatment section
Earthworks, equipment foundations, landscaping, utilities, mechanical works
Bastau Residential Complex in Irgeli village
The residential complex is a sectional development of 2 single-entrance blocks. Measures are provided for people with disabilities: ramps, tactile tiles, traffic signs, parking lots for people with disabilities. The number of parking spaces: 46 parking spaces. Transportation connection of the object is provided from the existing local driveway. Motor transport movement inside the complex on the intrasite passages of local importance. The vertical layout is designed to provide natural drainage from buildings and entrances to them along the roadway of adjacent roads to the lowered relief places. The construction site has a natural slope from south to north.
Bridge over Badam River in Shymkent
The bridge will increase traffic and pedestrian flow and facilitate communication between the northern and southern parts of the city.
Works: Erection of monolithic frame, girders, slope stabilization and landscaping works.
Partners
Contacts
RK, Almaty, 11, Azharly str. a.belgozhauly@muragerdev.kz